Our Work

Camberwell on The Green – Residential

PROJECT DETAILS

M&E Project Value: £5.5 million
Project Duration: 60 weeks
Client: Fraser Property
Main Contractor: Tolent Construction
Architects: CJCT
Consultants: Hoare Lea
Business Sector: Residential

The project comprised of a 101 1, 2 and 3 bedroom apartments over 6 storeys with associated ancillary accommodation and at ground floor a range of 7 retail units. Ilec-Imec are currently undertaking a full design & build M&E installation. The apartments are served via a district heating network with associated CHP and boiler plant. PV has been installed to help meet the requirements of the Greater London plan. Each apartment has been designed to code for sustainable homes level 4 and incorporates Nox filters to each dwelling.

SCOPE OF WORKS

The design, co-ordination and construction of the following building services:
^

Mechanical ventilation

^

Heating installation

^

Domestic water services

^

Above-ground drainage

^

Energy strategy

^

Lighting & controls

^

Electrical distribution

^

Fire alarm

^

Mechanical wiring