Our Work

Hampton By Hilton, Oxford

PROJECT DETAILS

M&E Project Value: £1.3 million
Project Duration: 40 weeks
Client: Firoka
Main Contractor: J F Finnegan
Consultant: Ridge Consulting
Architects: ICA Architects
Business Sector: Hotels
The project consisted of a 102-bedroom Hampton by Hilton Hotel over 2 floors. Each bedroom had VRF installation and associated leak detection. Hot water was generated utilising a micro CHP to meet the energy strategy. The lighting strategy was developed by ilec-imec with input from the interior designer to meet the client and brand requirements.

SCOPE OF WORK

The design, co-ordination and construction of the following building services:
^
VRF air-conditioning
^
Above-ground drainage
^
Mechanical ventilation
^
CHP & boiler installation
^
BMS installation
^
Lightning protection
^
Lighting & controls
^
Electrical distribution
^
Pod bathroom installation
^

Rainwater installations

^

Mechanical wiring